Detailed Schedule
Wed, June 12 2013 – Main Conference
8.00 | Registration (8.00 – 18.00) |
|
8.45 9.00 |
Opening Remarks (Auditorium) |
|
9.00 10.20 |
Invited Talks Alan Fern Wheeler Ruml (Auditorium) |
|
10.20 10.50 |
Coffee Break | |
10.50 12.20 |
Session Ia: Applications – I Planning Personalised Museum Visits (AF4)
Planning-Based Social Partners for Children Smart Urban Signal Networks: Initial Application of the SURTRAC Adaptive Traffic Signal Control System (AF10) |
Session Ib: Heuristics & Search – I Constricting Insertion Heuristic for Traveling Salesman Problem with Neighborhoods (MF1) Heuristics for Bounded-Cost Search (MS8)
Automated Agent Decomposition |
12.20 13.45 |
Lunch Break | |
13.45 15.00 |
Session IIa: MDPs, POMPDs Exploiting Fully Observable and Deterministic Structures in Goal POMDPs (MF28) A Flexible Approach to Modeling Unpredictable Trial-Based Heuristic Tree Search |
Session IIb: Optimal & Oversubscription Planning Faster Optimal Planning Abstractions for Oversubscription Planning (MF18)
|
15.00 15.30 |
Coffee Break | |
15.30 17.00 |
Session IIIa: Planning Under Uncertainty Behavior Composition as Fully Observable Non-Deterministic Planning (MF21) Compiling Conformant Probabilistic Planning Problems into Classical Planning (MF23) Paper Summary: Probabilistic Planning for Continuous Dynamic Systems under Bounded Risk (J8) Multi-Modal Journey Planning |
Session IIIb: Scheduling – I Dynamic Online Planning and Scheduling Using a Static Invariant-Based Evaluation Model (MF20) Optimally Scheduling Small Numbers of Identical Parallel Machines (MF17) De-Cycling Cyclic Scheduling Problems (MS2)
|
17.00 19.00 |
DC Posters & System Demos (open end) |
Thu, June 13 2013 – Main Conference
8.00 | Registration (8.00 – 18.00) |
|
9.00 10.00 |
Invited Talk Dan Weld (Auditorium) |
|
10.00 10.30 |
Coffee Break | |
10.30 12.00 |
Session IVa: Applications – II Timeline-Based Planning for Engaging Planning for Social Interaction in The Windy Domain — A Challenging Real-World Application of Integrated Planning and Scheduling (AS3) Planning under Uncertainty for Coordinating Infrastructural Maintenance (AF9) |
Session IVb: Heuristics & Search – II Incremental Planning with Adaptive Dimensionality (MF10)
An Investigation of Actions, Change and Space (J10)
|
12.00 13.30 |
Lunch Break | |
13.30 15.05 |
Session Va: Robotics, Path Planning An Approach for Efficient Planning of Robotic Manipulation Tasks (MF7) Subgoal Graphs for Optimal Pathfinding in Eight-Neighbor Grids (MF26) Path Planning with Compressed
An Optimal Any-Angle Pathfinding Algorithm (MS7)
|
Session Vb: SAT, CSP, Search Partially Grounded Planning as New Encoding Methods for SAT-Based A Constraint-Based Approach for Proactive, Context-Aware Human Support (J9) Modeling and Reasoning about Business Processes under Authorization Constraints: A Planning-Based Approach (J1) Solving the Traveling Tournament Problem with Iterative-Deepening A* (J12)
|
15.05 15.35 |
Coffee Break | |
15.35 17.05 |
Session VIa: Temporal Planning and Scheduling Combining a Temporal Planner with an External Solver for the Power Balancing Problem in an Electricity Network (AF6) An Optimal Constraint Programming Approach to the Open-Shop Problem (J7) Distributed Algorithms for Incrementally Maintaining Multiagent Simple Temporal Networks (MF2) Scheduling with Contingent Resources and Tasks (MF22)
|
Session VIb: Complexity, Foundations When Acyclicity Is Not Enough: Limitations of the Causal Graph (MF14)
A Generic Technique for Synthesizing Bounded Finite-State Controllers (MF13) |
17.05 19.00 |
Community Meeting (Auditorium) Including: ICAPS 2013 Best Dissertation Awards Cindy Wang Scalable Cooperative Multi-Agent Pathfinding with Tractability and Completeness Guarantees Nir Lipovetzky Structure and Inference In Classical Planning and ICAPS 2013 Influential Paper Award |
|
20.30 23.00 |
Banquet (including Award Ceremony) (Palazzo Rospligliosi) |
Fri, June 14 2013 – Main Conference
8.00 | Registration (8.00 – 15.30) |
|
9.00 10.00 |
Invited Talk Giuseppe De Giacomo (Auditorium) |
|
10.00 10.30 |
Coffee Break | |
10.30 12.00 |
Session VIIa: Heuristics & Search – III The Relative Pruning Power of Strong Stubborn Sets and Expansion Core (MF29) Incremental LM-Cut (MF19)
Who Said We Need to Relax All Variables? (MF15)
|
Session VIIb: Scheduling – II Hybrid Queueing Theory and Scheduling Models An Efficient Memetic Algorithm for the Flexible Job Shop with Setup Times (MF11) A Min-Flow Algorithm for Minimal Critical Set Detection in Resource Constrained Project Scheduling (J6) A Reformulation for the Problem of Scheduling Unrelated Parallel Machines with Sequence and Machine Dependent Setup Times (MS1) |
12.00 13.30 |
Lunch Break | |
13.30 15.00 |
Session VIIIa: Applications – III Autonomous Search and Tracking via
|
Session VIIIb: Control, Games Optimal Control as a Graphical Model Inference Problem (J4) On Adversarial Policy Switching with Experiments in Real-Time Strategy Games (MS10) Linear Fitted-Q Iteration with Multiple Reward Functions (J5) Temporal-Difference Search in Computer Go (J11) Domain Predictive Control Under Uncertain Numerical State Information (MS12) Incremental Dynamic Controllability Revisited (MS13) |
15.00 15.30 |
Coffee Break | |
15.30 16.15 |
Session IXa: Heuristic Planning What’s in It for My BDD? On Causal Graphs and Variable Orders in Planning (MS11) Narrative planning: Compilations to classical planning (J3)
|
Session IXb: Heuristics & Search – IV Counterexample-Guided Cartesian Abstraction Refinement (MS15) Moving Target Search with Compressed Path Databases (MS3) Symmetry Breaking: Satisficing Planning and Landmark Heuristics (MS5)
|
16.15 16.30 |
Closing Remarks (Auditorium) |